News

16.05.25

Strive for Success

Preparing for the Next Phase of Rapid Wiring

Since launching our dedicated wiring department in early 2024, demand has grown significantly. To support this growth and create room for future expansion, we have secured a new 5000 square foot facility directly across the road from our main site. The building is currently being prepared as a dedicated wiring space, designed to enhance focus, streamline production, and improve flow across our cable and wire assembly operations.

Equipped for What Comes Next
As we prepare the space, we are working closely with leading global suppliers of automated wire processing equipment. The new facility is being designed with advanced capability in mind, positioning us to scale efficiently, support more complex assemblies, and deliver even faster lead times. It is a space built for growth, speed, and long term performance.

Harness the power….

Share to: